home *** CD-ROM | disk | FTP | other *** search
/ QRZ! Ham Radio 8 / QRZ Ham Radio Callsign Database - Volume 8.iso / pc / files / p_tapr / tnc2mdm.arc / TNC2MDM1.TXT < prev    next >
Text File  |  1988-07-15  |  5KB  |  129 lines

  1.  
  2.                          APPENDIX A
  3.  
  4. USE OF OSCILLOSCOPE FOR 50 PERCENT DUTY CYCLE DETERMINATION
  5.  
  6.  
  7. The  oscilloscope can be used to indicate a 50 percent  duty 
  8. cycle on square wave data in two different ways.   The first 
  9. is  based  on timing each half cycle of the square wave  and 
  10. comparing  the  time durations.   This  method  requires  an 
  11. oscilloscope  that can be reliably triggered on the incoming 
  12. data.  It also requires that the sweep speed can be operated 
  13. in uncalibrated mode with continuous adjustment.
  14.  
  15. The second method uses the vertical input coupling capacitor 
  16. to  integrate the incoming square wave so  the  oscilloscope 
  17. can  display the DC offset.   This method has no  triggering 
  18. requirements  but the oscilloscope must be able to free  run 
  19. in  the  absence of triggering.   This method also  requires 
  20. that  the  vertical  position  and  the  vertical  gain   be 
  21. adjustable, and that the input can be AC coupled.
  22.  
  23. Both  methods  use  the  logic level data  output  from  the 
  24. demodulator.   This  means that the input impedance of  just 
  25. about  any  oscilloscope  is plenty  high  enough  for  this 
  26. application.
  27.  
  28.  
  29.  
  30. First method:
  31.  
  32.             TIME BASED DUTY CYCLE DETERMINATION
  33.  
  34.  
  35. 1.  Connect  the  'scope  vertical input to the end  of  R68 
  36.     which  connects to Q13's collector as described  in  the 
  37.     demodulator alignment procedure.
  38.  
  39. 2.  Do  steps  4  through  7 in  the  demodulator  alignment 
  40.     procedure so that there is a square wave data signal  to 
  41.     observe on the 'scope.
  42.  
  43. 3.  Set  the 'scope to trigger on the positive going edge of 
  44.     the square wave.
  45.  
  46. 4.  Adjust  the sweep rate so that exactly 1 complete  cycle 
  47.     of  the square wave is displayed.   Use  the  horizontal 
  48.     position  control  to exactly align the  positive  going 
  49.     trigger  point edge of the signal with the left edge  of 
  50.     the  graticle  on the 'scope face.   Use the sweep  rate 
  51.     controls  to exactly align the next positive going  edge 
  52.     of  the signal with the right hand edge of the  graticle 
  53.     area.   There is some jitter present in the data at this 
  54.     point  and it will appear as though there are  really  2 
  55.     transitions on the second positive going edge very close 
  56.     together.  Use the midpoint of the 2 edges for alignment 
  57.     to  the  right hand side of the graticle.   It  will  be 
  58.     necessary  to  use the continuously variable sweep  rate 
  59.     capability  of  the 'scope for this  adjustment  as  the 
  60.     calibrated  steps  are  unlikely to result in  an  exact 
  61.     alignment.
  62.  
  63. 5.  Now  adjust the demodulator center frequency  using  the 
  64.     appropriate  variable resistor for the demodulator being 
  65.     aligned.   Observe  that the NEGATIVE going edge of  the 
  66.     signal in the central graticle area moves in relation to 
  67.     the 2 POSITIVE going edges at the graticle extremes.
  68.  
  69. 6.  Set  the  demodulator  center  frequency  so  that   the 
  70.     NEGATIVE  going edge occurs exactly on the main vertical 
  71.     graticle line in the exact center of the graticle.  This 
  72.     assures  equal time for the data when it is in the  high 
  73.     state as when it is in the low state.   Again,  use  the 
  74.     center of the jitter area.
  75.  
  76. End of method 1
  77.  
  78.  
  79.  
  80. Second method:
  81.  
  82.       DC OFFSET DETERMINATION OF 50 PERCENT DUTY CYCLE
  83.  
  84.  
  85.   NOTE! This  is the PREFERRED method as it does not require 
  86.         estimation of jitter areas. 
  87.  
  88.  
  89. 1.  Connect  the  'scope vertical input to the  end  of  R68 
  90.     which  connects  to Q13's collector as described in  the 
  91.     demodulator alignment procedure.
  92.  
  93. 2.  Do  steps  4  through 7  in  the  demodulator  alignment 
  94.     procedure  so that there is a square wave data signal to 
  95.     observe on the 'scope.
  96.  
  97. 3.  Set the 'scope timebase to free run.
  98.  
  99. 4.  Adjust  the  vertical gain so that there are  exactly  6 
  100.     major  graticle  divisions (usually CM)  between  the  2 
  101.     horizontal lines displayed on the 'scope face.
  102.  
  103. 5.  Ground  the 'scope vertical input either by  temporarily 
  104.     removing  the probe from the test point and attaching it 
  105.     to  ground  or  by using the switch  provided  for  this 
  106.     purpose  on the 'scope vertical amplifier.   Adjust  the 
  107.     vertical  position  so that the horizontal  trace  falls 
  108.     EXACTLY on the middle horizontal graticle line.
  109.      
  110. 6.  Make  sure  the  'scope vertical input  is  set  for  AC 
  111.     coupling during the rest of this procedure.
  112.  
  113. 7.  Reattach the probe to the test point if necessary.
  114.  
  115. 8.  Now  adjust  the demodulator center frequency using  the 
  116.     appropriate variable resistor for the demodulator  being 
  117.     aligned.   Observe  that the 2 horizontal lines move  in 
  118.     the   vertical  plane  in  relation  to  the  horizontal 
  119.     graticle lines.
  120.  
  121. 9.  Set the demodulator center frequency so that both  lines 
  122.     are  exactly the same distance from the middle hoizontal 
  123.     graticle  line.    This  should  place  one  of  them  3 
  124.     divisions above it and the other 3 divisions below it.
  125.  
  126. End of method 2
  127.  
  128.  
  129.